Canatal
Canatal
  • Home|
  • Contact|
  • Français
  • TIMESMART MANUFACTURING
    • Certifications
    • Strategic Impact
    • Specialized Plants
    • Procurement
    • Manufacturing Equipment
    • Quality Policy
  • About Us
    • The Canatal Difference
    • Corporate Values
    • History
    • News
    • Jobs
    • Locations
    • Health & Safety and Environmental Protection
    • Corporate Commitment
  • Project Expertise
    • Strategic Impact
    • Pre-Construction Assistance
    • Project Management
    • Logistics
    • Technology
    • Steel structure erection
  • Projects
    • Search Projects
    • LEED-certified (Green) Projects
    • References
  • Design & Engineering
    • Strategic Impact
    • Detailing
    • Connection Engineering
    • Special & Complex Product Team
  • Time Engineering
    • Strategic Impact
    • Time Engineering Process
    • Time Engineering Team
    • Time Engineering Alert
    • Time Engineering Scheduling Model
    • Time Engineering Reports
  • » see available jobs
Seven Lebanon Street
Seven Lebanon Street
  • Home>
  • Search Projects>
  • Seven Lebanon Street
Print

Seven Lebanon Street


						
												
									

The impossible made possible

It was essential to deliver this 1,448-ton student residence steel structure on schedule. Then, the impossible began, the owner ordered the removal of the entire fourth floor from the original plans.

Just prior to steel fabrication, this same fourth floor was ordered back in by the owner.

Canatal’s Time Engineering Team masterminded  the resulting amount of work to complete the project and deliver on our commitment.

 

MIT Graduate Residence Hall Cambridge,MA
Structural steel tonnage: 1,448 tons